Ongoing Projects
S.No. Description of work Place and State Name & Address of Employers
1  Rehabilitation and Upgradation of NH-565 Km. 294.000 to Km. 361.327 (Vaggamplle to Dornala T-Junction) to two-lanes with paved shoulders in the state of Andra pradesh  Andra Pradesh MORT & H
2  Rehabilitation and Upgradation of NH-565 Km 198.694 to 294.000 Markapuram to Veggam Palle Section) to Two lane paved shoulders in the state of Andra pradesh  Andra Pradesh MORT & H
3 Four Laning of Gwalior -Shivpuri Section of NH-3 from km 15.600 of NH- 75 ( End of Gwalior bypass) ti jn 236.00 of NH-3 in the State of Madhya Pradesh under NHDP phase IV on BOT (Toll) on DBFOT  Length 125.300 Kms
 
Gwalior(M.P.) M/s Pan India Infrastructures Pvt. Ltd. Mumbai
4 Rehabilitation and Upgradation of Kerala Border to Kollegala Section of NH-212 from Km. 136.600 to 
268.475 excluding the stretch from Km. 239.600 to Km. 241.520(1.92 Km) to Two Laning with paved
shoulders in the state of Krnataka (Length 129.955) 
Karnataka MORTH
5 Four Laning of REWA-MP/UP BORDER Section of NH-7 in the state of Madhya Pradesh on DBFOT basis Length 89.300 Km Rewa (M.P.) JMC Projects (India) Ltd., Mumbai
6 Construction of central Spilway, Earthen Dam & its Allied works and Supply and errection of redial gates for Mohanpura major Multipurpose Project (WRD) Rajgad (M.P.) WRD M.P.
7 Strengthening, Widening of Four Laning of Mangwan-MP / UP Border (NH-27) Road Length 52 Km Mangwan (M.P.) Topworth Infra Private Limited, Mumbai
8 Strengthening, Widening of Four Laning of Satna-Bela (NH-75) Road Length 48 Km Satna (M.P.) Topworth Infra Private Limited, Mumbai
9  Construction of Devguradia Kampel Doublechowki Road Length 36.65 Km. Indore (M.P.) PUBLIC WORKS DEPARTMENT NH DIVISION INDORE (MP)
10  Development Work (Civil) of Scheme No. 166 (Part -A) , Indore Indore (M.P.) Indore Development Authority (M.P.)
11  Development Work (Civil) of Scheme No. 166 (Part -B) , Indore Indore (M.P.) Indore Development Authority (M.P.)
12  Rehabilitation and Upgradation of Jarwal to Bahraich Section Km. 43.000 to Km. 93.000 of NH 28C in Uttar Pradesh to two lane with paved shoulder on EPC mode under NHDP phase IV (Length - 50 Km.) Uttar Pradesh MORTH
13  Execution of the Work "Raising and Strengthening of Existing Road Chechat to Undwa upto M.P. Border (SH-9A) From Km 109/0 To Km 137/200 Rajashthan Rajasthan State Road Development & Construction Corporation Ltd.
14 Improvement/Augmentation of Tirumayam to Manamadurai section to two lane with paved shoulders from Km. 77.200 to Km. 154.929 (existing chainage Km 149.800) (Total Design Length =77.729 Km) of NH- 226 in the state of Tamil Nadu under NHDP phase IV on EPC mode.  Tamil Nadu NHAI
15  Re- Construciton and Upgradation of Budhni to Itarsi Road (NH-69) 35.10 Km. Hoshangabad Madhya Pradesh Road Development Corporation Limited Bhopal (M.P.)
16  Costruction and up gradation of Road by Rigid and Flexible Pavement i/c Utility Shifting Under Ujjain-Simhastha Road Project (Length-----Km) Ujjain(M.P.) Public Work Department Ujjain Zone Ujjain
17  Construction of 896 EWS and 1080 LIG under affordable housing scheme at Gram Barrai Phase-I, (Building Work) Bhopal (M.P.) Bhopal Development Authority (M.P.)
18

Redevelopment & Redensification o Government Housing under Ram Nagar –Pari Bazaar- Bara Mahal Scheme, Bhopal M.P. 

Bhopal (M.P.) Bhopal Vikas Pradhikaran
19  Construction of C.C. Lined Open Channel about Rewa River (Near Bhanpura Town)

Rewa (M.P.) Water Resource Department MP
20 Construction of BAHUTI HIGH LEVEL CANAL from KM 18 to KM 74 With full canal network to irrigate irrigable command area of 65000 hectares with all in-line structures on the canal system can TURNKEY BASIS with defect liabilities period of THREE YEAR reckoned from issuance of completion certificate.  (TURNKEY BASIS)

Rewa (M.P.) Water Resource Department MP
21

 Madhya Pradesh Jal Nigam Maryadit "Mardanpur Group Water Supply Scheme Disstt. Sehore(M.P.) for Ultimate Capacity of bringing 25.65 MLD treated water (22 hour flow from the source Narmada River, located near Village Mardanpur , Tehsil Rehti Distt. Sehore)
 

 

Sehore (M.P.) M/s Vishwa Infrastructure & Services Pvt. Ltd.
22  Rehabilatation and Upgradation of NH - 765 from Km. 23.000 to Km. 108.800 Hyderbad to Dindi Section in the state of Andhra Pradesh through an EPC Basis (Length. 85.8 Km.) PKG-1 
Hyderabad(A.P.) MORTH
23 Rehabilation and Upgrading to 2 lanes/2 lane with Paved Shoulders Configuration and Strengthening of Pratapgarh-Padi Section (km 80.0 to km 180.0) of Nh-113 in the State of Rajasthan under Phase-1 of National Highways Inter-Connectivity Improvement Projects (NHIP) Rajashthan MORTH
24 Two Laning with Paved Shoulder of Karauli-Dholpur section of NH – 11B from km 83.960 to Km 184.460 (length 100.900 Km) in the State of Rajasthan under NHDP Phase IV on EPC mode Project. Rajashthan MORTH
25 Rehabilitation and upgradation of existing NH 222 (New NH 61) from Km. 615.000 to Km. 668.600 (Kalyan to Nirmal Section) to wo lane with paved shoulder in the state of Andhra Pradesh under NHDP-IV through Engineering , Procurement Construction (EPC) Basis PKG-02 Andhra Pradesh MORTH
26 Development of Betul Sarni Junnardeo-Parasia (SH-43) Road on BOT (Toll+Annuity)Basis Total Length-124.10 Km Betul(M.P.) Madhya Pradesh Road Development Corporation Limited Bhopal (M.P.)
27 “Rehabilitation and Upgrading to 2 lanes /2 lane with Paved Shoulders Configuration & Strengthening of Lalsot-Karauli Section (km 0 to 85)of NH- 11B in the State of Rajasthan (Package No. NHIP-RJ-11B-3)”.   Rajashthan MORTH
28 Rehabilation and upgradation of existing NH-365 from Km. 72.600 to 121.000 (Thanamcherla to Jamandlapally section) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP-IV through Engineering procurement and construction (EPC) Basis PKG-04 Andhra Pradesh MORTH
29 Rehabilation and upgradation of existing NH-365 from Km. 154.000 to 187.000 (Mangalvarpet to Mallampally section) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP-IV through Engineering procurement and construction (EPC) Basis PKG-03 Andhra Pradesh MORTH
30 TWO LANING WITH PAVED SHOULDERS OF JHALAWAR – RAJASTHAN / M.P. BORDER SECTION OF NH-12 FROM KM 346.540 (EXISTING CHAINAGE KM 346.540) TO KM 408.700 (EXISTING CHAINAGE KM 412.000)  (LENGTH 62.160 KM) IN THE STATE OF RAJASTHAN UNDER NHDP PHASE-IV ON ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) MODE Jhalawar , Rajasthan National Highway Authority of India
31 Widening & Reconstruction of  Civil work pkg. No. A Road No. 01 Mahua Chuwahi (Length-48.9)

(M.P.) MPRDC
32 Construction of Damoh-Batiyagarh Baxwaha-Hirapur Road (Length-71.30 Km.) Damoh(M.P.) Madhya Pradesh Road Development Corporation Limited Bhopal (M.P.)
33 "Widening and Reconstruction of Ujjain- Makshi Road Under Madhya Paradesh Distic Connectivity sector project Ujjain (M.P.) Madhya Pradesh Road Development Corporation Limited Bhopal (M.P.)
34 Periodical Renewal work including rebuilding of crust in dilapidated stretches and incident water management construction of Hume pipe culverts RCC Railing and Wearing coat etc. In Rewa Katni section of NH-7 from Km. 299.00 to Km. 360.10 Km(54.6 km) in the state of Madhya Pradesh Rewa/Katni(M.P.) NHAI
35

Periodic Renewal work in Rewa - Kation section from Km. 242.300 to 298 & Km. 307 to 311 & Km. 321 & 322 (42.20 Km) of NH-7 in the State of Madhya Pradesh

Jabalpur(M.P.) NHAI PIU(Jabalpur)
36 Widening and Reconstruction of Shahdol Singhpur Turla Pandaria Road Project (SH-09) Balance Work Jabalpur (M.P.) Madhya Pradesh Road Development Corporation Limited Bhopal (M.P.)
37 Rehabilitation / Strengthening of Satna-Chitrakout for total length 74.132 Kms. Exixting single lane to double lane road in the state of M.P. Satna (M.P.) Topworth Infra Private Limited, Mumbai
38 Tikamgarh (Dhajraj) Jatara-Palera Nowgaon Road on BOT(Toll+Annuity) Basis Tikamgarh(M.P) Madhya Pradesh Road Development Corporation Limited Bhopal (M.P.)